Monday, August 17, 2020

Running around, Finally!

It has taken a couple of weeks but I now have the east end of the Sugarwood Siding connected.
IMG_2468.jpg

That in itself does not allow me to preform run a around because, the west turnout of Sugarwood Siding is at the end of the curve coming from the west. So that curve had to be laid and is complete now.

Spline roadbed laid and laying the ties.
IMG_2470.jpg

IMG_2471.jpg

IMG_2472.jpg

Rails down.
IMG_2473.jpg

IMG_2474.jpg

IMG_2475.jpg

With the exception of the spurs for McFoods and Olie’s Cold Storage the Sugarwood Yard section is complete.
SugarwoodYard-2.png

As can be seen in the pictures above I have started working on McFoods and I have mocked up the wall panels.
IMG_2469.jpg

I don’t think I will be installing the McFood and Olie’s Cold Storage spurs until I have the structures figured out. For now, the next step is run trains and push/pulls cars and get the track reliable. My Genset and MP15AC (B type trucks - 2 axles) have no issues with any portion of the track work so far but my SD40-2 (C type trucks - 3 axles) has an issue with the diverging route of the turnout at the east end of Surgarwood Siding.

I also want to get the other three modules of the layout built and install before the end of September.

Until next time.

For information about me check out the About page on this blog.

Tuesday, August 4, 2020

I’m about to run around!

Over the past week and holiday, I was able to complete laying the track for the Sugarwood Yard and I started laying the sub-roadbed to complete the east end of Sugarwood Siding.

There is not a whole lot to be said about laying the track in the yard it is pretty straight forward. Thought I did want the yard to look like it has been around for a while so I did not use a straight edge to lay the yard perfectly straight, as can be seen in the two photos below.

Theyard1.jpg

Theyard2.jpg

To connect the east end of Sugarwood Siding I decided to go with the spline roadbed approach and I find it easier and faster than I thought. I am using 1/8” x 1/8” basswood glued to the foam. I have been surprised that how fast the glue dries, about thirty minutes after laying a spline I can remove the pins and lay another spline. Towards the upper center of the top photo and left center of the bottom photo, the east end of Sugarwood siding can be seen.

Until next week.

For information about me check out the About page on this blog.