Sunday, June 14, 2020
What a difference a week makes…
This week proved to be a bit better than I expected when I saw the weather report for the past week.
On Monday, I was able to complete the second of the three modules I need to start laying track. Then on Tuesday I was able to attach the two modules together. The rest of the week was less productive with many commitments so, I was unable to get the third module built and with the weather reports it looked like the third module would have to wait until next week. However, I was smiled upon on Sunday afternoon and I was able to build the third module. It is now hanging in place waiting to be joined to the second module. A project for next week.
I also started on the lighting for the modules. I probably should explain the reason I chose this design for my benchwork. Modular, because I am renting, French cleat, because a significant portion will be above my desk and the ‘C’ shape because I want to have the lighting built in to layout. My plan is to have the lighting controlled by my fast clock (see post to come later). I have mounted two 3/8” square dowel length wise 4” from the front and 4” from the back. To the Square dowel I attached RGBW (Red, Green, Blue and White) LED strips that will be controlled by an Arduino (also described in later post). These LED strips have an adhesive backing so press and stick. In the past I have found this adhesive does not stay stuck to wood so, I coated the side I would be attaching the LEDs to with a fifty-fifty water glue mixture to provide a better surface to stick to. It has only been a few days but so far so good.
Sorry, no pics this week but there will be some next week.
Until next week.
For information about me check out the About page on this blog.
Add comment
Fill out the form below to add your own comments